Project Details
- Client: Helsingor Limited (Ballymore Ireland)
- Location: Dublin, Ireland
- Value: €750 Million (Estimated)
Project Description
Traffic consultants in the planning approval process for the Stapolin Village Masterplan. Phases 1-6 have been granted planning permission. Duties performed to date include:
- Transportation Chapter of EIS for each separate phase of development
- Design of development access roads and junctions - external and internal
- Liaising with Client and Local Authority on Transportation Masterplan
The Transportation EIS’ included detailed traffic models set up to analyse the potential impact of the development on the surrounding road network as well as the new development internal junctions. Consideration was also given to development parking and pedestrian and cyclist provision.
A new four-arm signal controlled junction was designed on Grange Road to facilitate access to the development from Grange Road to the south. A new roundabout junction was also designed on Coast Road to the west to facilitate a secondary development access. Both junctions have been constructed and are currently operational. All internal roads and junctions have been designed to recommended guidelines and subjected to detailed swept path analyses to ensure a high level of service is provided for all vehicles. Consideration also given to pedestrian and cyclist facilities at internal and external junctions.
Traffic engineering services includes close liaison with the client and broader project team on the internal site layout and development accesses. Details and specifications for internal roads, access to internal car parks, and internal development pedestrian facilities are advised to the project team. Frequent meetings are held with the Local Authority roads engineers pre-planning to ensure that specific Local Authority concerns and requests are accommodated into the design.